El-Sherbiny reviewed the current electricity supply status
for drinking water pumping stations, water treatment plants, sewage pumping
stations, and wastewater treatment plants in new cities, as well as facilities
operated by the Holding Company through its 17 subsidiaries across
governorates.
He directed efforts to secure electricity supply for all
water and wastewater facilities in coordination with the Ministry of
Electricity and Renewable Energy, stressing the need for backup generators to
operate during emergencies. He also instructed the preparation of a detailed
report on all facilities, outlining their electricity supply status and
requirements for securing continuous power, including generator needs for each
facility.
The minister affirmed the goal of achieving optimal
operational efficiency across all elements of the water and wastewater system,
highlighting the importance of ongoing maintenance and securing all necessary
resources for the facilities.